Bored pier inspection in Officer

Where the engineer has specified piers, we check them once the holes are bored and before any concrete goes in.

  • Holes bored and cleaned, before the pier concrete
  • About 1 hour on site
  • Report within 24 hours
Request your quoteSend your details and an Officer inspector will phone you.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage1 of 7
When to bookHoles bored and cleaned, before the pier concrete
Time on siteAbout 1 hour on site
Inspected againstAS 2870, AS 3600, the geotechnical report and the engineer's footing design

What is included in a Officer bored piers inspection

  • Each pier located against the engineering plan
  • Piers in line under the beams they support
  • Diameter measured against the drawings
  • Depth measured where it can be reached
  • Base checked for loose spoil and water
  • Cages or bars placed as the engineer requires
  • Pier count matched to the plan
  • Set-out pegs and string lines checked
  • Spacing between piers
  • Hole sides stable and not collapsing
  • Notes from the soil report followed
  • Site access and safety recorded
Why it matters here

Bored piers inspections on Officer builds

On an Officer pier job we have recorded piers sitting outside the beam line, bored out of alignment and narrower than the drawings call for. A pier that does not land under its beam carries nothing, and it cannot be moved once it is filled.

What we find at this stage in Officer

  • Pier positions off the beam line
  • Piers out of alignment with each other
  • Diameter below the engineering
  • Depth not reaching the founding layer
  • Spoil or groundwater sitting in the hole
Sample findings

Sample defects found during our bored piers inspections in Officer

Annotated findings from Bored piers inspections.

Bored pier set outside the slab beam line it is meant to sit under, found during a bored pier inspection in Officer
Bored pier set outside the slab beam line it is meant to sit under
Piers bored out of line, so not all of them will land under the beams, found during a bored pier inspection in Officer
Piers bored out of line, so not all of them will land under the beams
Pier diameter smaller than the size shown on the engineering drawings, found during a bored pier inspection in Officer
Pier diameter smaller than the size shown on the engineering drawings

The other stages of a Officer build

  1. Slab pre-pour inspection in Officer2Slab pre-pourFormwork, steel and pods in, the day before concrete
  2. Frame inspection in Officer3FrameWalls and trusses up and braced, before wrap and insulation
  3. Lock-up (pre-plaster) inspection in Officer4Lock-up (pre-plaster)Roof, windows and cladding on, before plasterboard
  4. Fixing inspection in Officer5FixingDoors, mouldings and cabinets in, before painting
  5. Waterproofing inspection in Officer6WaterproofingOnce the membrane has cured, ahead of tiling
  6. Pre-handover (PCI) inspection in Officer7Pre-handover (PCI)Roughly seven days out from your PC date

All construction stage inspections in Officer →

Guides

Construction stage guides for Officer

All guides →

Book a bored piers inspection in Officer

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Bored piers inspections in Officer: common questions

Why would my Officer slab need piers?

The engineer specifies them where the ground or the design calls for deeper support, for example soft or filled ground, a steep cut or heavy point loads.

What do you check against?

The engineering drawings: pier locations, diameters and depths, and any notes from the geotechnical report.

How long does it take?

Usually under an hour.

What if a pier is in the wrong place?

It is far easier to bore a new hole now than to deal with it after the pour. The report shows each one so the builder and engineer can decide.

Is this the same as the slab inspection?

No. Piers are checked first; the slab pre-pour comes later once steel and pods are set.

Can you confirm the founding depth?

We measure what is accessible and compare it with the engineering. Confirming the founding material is the engineer's or geotechnical engineer's call.