Lock-up inspection in Officer

Roof on, windows in, cladding up, insulation going in. This is the final look at the frame, the roof underside and the flashings before plaster hides them.

  • Roof, windows and cladding on, before plasterboard
  • 1 to 2 hours on site
  • Report within 24 hours
Request your quoteSend your details and an Officer inspector will phone you.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage4 of 7
When to bookRoof, windows and cladding on, before plasterboard
Time on site1 to 2 hours on site
Inspected againstAS 3700 (masonry), AS 4773, AS 2047 (windows), NCC Part 3.5 roof and wall cladding, manufacturer flashing details

What is included in a Officer lock-up (pre-plaster) inspection

  • Frame stage items rechecked
  • Packing materials under trusses and beams
  • Top plates in full bearing
  • Sarking laps and tension
  • Roof penetrations sealed to sarking
  • Window and door flashing tape
  • Wall wrap laps and tears
  • Double studs joined
  • Bracing damage repaired
  • Floor sheeting fixings
  • Insulation installed where visible
  • Services clear of structural members
  • Cladding fixing and clearances
Why it matters here

Lock-up (pre-plaster) inspections on Officer builds

Some of the most serious findings on Officer builds come at lock-up: trusses packed up on wedges or fibre cement offcuts, top plates wedged level, and roof penetrations cut through the sarking with nothing to reseal them.

What we find at this stage in Officer

  • Non-structural packing under trusses and beams
  • Top plates propped on wedges
  • Roof penetrations unsealed at the sarking
  • Sarking folded or lapped down the slope
  • Window flashing tape lifting
  • Frame items from the last stage still open
Roof sarking folded back on itself instead of laid flat and tensioned, found during a lock-up inspection in Officer
Roof sarking folded back on itself instead of laid flat and tensioned
Sample findings

Sample defects found during our lock-up (pre-plaster) inspections in Officer

Annotated findings from Lock-up (pre-plaster) inspections.

Wedges packed under trusses to carry the heater platform on a non-loadbearing wall, found during a lock-up inspection in Officer
Wedges packed under trusses to carry the heater platform on a non-loadbearing wall
Fibre cement offcuts packed under a steel beam and trusses, not rated to carry load, found during a lock-up inspection in Officer
Fibre cement offcuts packed under a steel beam and trusses, not rated to carry load
Top plate propped on wedges to bring it level instead of bearing fully, found during a lock-up inspection in Officer
Top plate propped on wedges to bring it level instead of bearing fully
Roof penetrations cut through the sarking with no tape or collar to reseal it, found during a lock-up inspection in Officer
Roof penetrations cut through the sarking with no tape or collar to reseal it

The other stages of a Officer build

  1. Bored piers inspection in Officer1Bored piersHoles bored and cleaned, before the pier concrete
  2. Slab pre-pour inspection in Officer2Slab pre-pourFormwork, steel and pods in, the day before concrete
  3. Frame inspection in Officer3FrameWalls and trusses up and braced, before wrap and insulation
  4. Fixing inspection in Officer5FixingDoors, mouldings and cabinets in, before painting
  5. Waterproofing inspection in Officer6WaterproofingOnce the membrane has cured, ahead of tiling
  6. Pre-handover (PCI) inspection in Officer7Pre-handover (PCI)Roughly seven days out from your PC date

All construction stage inspections in Officer →

Guides

Construction stage guides for Officer

All guides →

Book a lock-up (pre-plaster) inspection in Officer

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Lock-up (pre-plaster) inspections in Officer: common questions

Why check the frame again at lock-up?

Trades have worked through the house since frame stage. Packing, notching and damaged bracing often appear after the frame inspection.

What is wrong with packing under a truss?

Only rated materials, sized and fixed correctly, can carry load. Wedges and sheet offcuts can crush or slip.

Do you go into the roof?

We inspect from inside the house looking up and from the scaffold or a ladder where it is safe.

Do you check insulation?

We note whether wall and ceiling insulation is in where it can be seen, but the energy rating is not assessed.

What about cables and pipes?

We record where services are damaging framing. We do not test electrical or plumbing systems.

How much notice?

A few days. Plaster often follows quickly, so book as soon as the roof is on.